Brain Teaser: The Digital Twin Synchronization Problem
A factory has four production lines, each with a digital twin that updates every:
Line 1: Every 2 minutes
Line 2: Every 3 minutes
Line 3: Every 5 minutes
Line 4: Every 7 minutes
If all digital twins synchronize their data at 9:00 am, when will be the next time that all four will have fresh, synchronized data simultaneously?
Answer: At 12.30 pm. 210 minutes later. This is the least common multiple of 2, 3, 5, and 7, which is 210 minutes.
